Kenesaw Avenue between
Taliluna Avenue and Cherokee Boulevard
·
Navaho Road between
Scenic Drive and South Garden Road
·
Bluff View Road
between Holloway Drive and Southgate Road
·
Whitlow Avenue between
Lakeland Drive and Bluff View Road
·
Agawela Avenue between
Taliluna Avenue and Cherokee Boulevard
Crews
will also work on the following roads with intermittent lane closures
between 7 a.m.– 5 p.m.:
·
Cherokee Boulevard
between Southgate Road and Kenesaw Avenue (westbound lane closed during daytime
work hours with traffic flow detoured via Kenesaw Avenue, Taliluna Avenue, and
Southgate Road)
-
Eastbound traffic flow
on this stretch of Cherokee Boulevard and Sequoyah Greenway will remain open at
all times
Crews
will also work in the following off-road easements with minimal traffic
impacts:
·
Easement between
Sequoyah Avenue and Taliluna Avenue (Wastewater Rehabilitation)
·
Easement between
Holloway Drive and Whitlow Avenue (Wastewater rehabilitation and restoration)
·
Easement between
Southgate Drive and Bluff View Road (Restoration)
·
Easement between
Iskagna Drive and Woodland Drive (Restoration)
Closed-circuit
Television Inspection – Crews will continue to work throughout the Phase 2 area next
week. Temporary lane closures will be implemented as needed when crews are
present.
Sequoyah
Park –
Morgan Construction and their subcontractors continue to rehabilitate the
existing wastewater main and manholes in Sequoyah Park. See the attached map
showing current work corridors within the park. The park, all entrances and
parking areas, and boat ramp remain open during this work. Morgan Construction
is also maintaining a fenced area in the middle parking lot for equipment and
materials storage. KUB has coordinated work in the park with City of Knoxville
Parks and Recreation and the Kingston Pike Sequoyah Hills Association.
Informational banners have been placed in the park entrances/parking areas to
provide park visitors with details about the wastewater rehabilitation work.
Updates on the progress of work in the park will be posted weekly and as needed
on this blog site.
Natural
Gas System Work – Crews have resumed natural gas inspection and maintenance
work at various locations throughout Sequoyah Hills. This work may require
short term traffic impacts in the immediate area where crews are working.