Friday, March 15, 2019

Sequoyah Hills Wastewater Project

March 15, 2019 UPDATE – Weekly Update:

Noelton Drive Water Main Replacement Project – KUB Underground Construction crews have completed all water main installation, testing, and customer service line connections on Noelton Drive, Chippewa Circle, and Dogwood Lane. Paving and restoration will continue on these streets over the next several weeks as weather conditions allow.

Sequoyah Hills Wastewater Rehabilitation Phase 1 – Manhole rehabilitation crews will continue to work at various locations throughout the Phase 1 area. Temporary lane closures may be needed in the immediate area where crews are working.

Sequoyah Hills Wastewater Rehabilitation Phase 2 – KUB Phase 2 contractor, Morgan Construction, completed wastewater system rehabilitation work on Kenesaw Avenue, Keowee Avenue, and Taliluna Avenue this past week. Paving and restoration work requiring intermittent lane closures between 7 a.m. – 5 p.m. will continue on these streets next week. The contractor will begin rehabilitation work on the section of Sequoyah Avenue between Agawela Avenue and Southgate Road next week. This section of Sequoyah Avenue will be closed to through traffic between 7 a.m. – 5 p.m.

Sequoyah Park – Morgan Construction is scheduled to begin work to rehabilitate the existing wastewater main and manholes in Sequoyah Park in late March. The park and parking areas will remain open during this work. More information will be communicated as details are finalized in the coming days. Appropriate traffic control measures, including signs and barriers, will be in place to assist with traffic flow. Access to driveways will be maintained. All lanes will reopen to normal traffic flow outside of listed work hours and on weekends. The Sequoyah Greenway will not be affected by this work.


(Sequoyah Hills) Sequoyah Hills Area Road Closures [February 18-22] – KUB contract crews will implement the below indicated road closures, from 7 a.m. – 5 p.m., starting Monday, March 18, through Friday, March 22, as work continues on the wastewater collection system in the area:
  • Sequoyah Avenue between Southgate Road and Agawela Avenue – closed daily during work hours.
  • Taliluna Avenue between Kenesaw Avenue and Tugaloo Drive – closed intermittently as needed.
  • Kenesaw Avenue between Woodland Drive and Iskagna Drive – closed intermittently as needed.
  • Keowee Avenue between Southgate Road and Agawela Avenue – closed intermittently as needed.
Access to area homes will be maintained, and barricades and signs will be on site to assist with traffic control. Follow-up advisories will be issued as necessary. 