Friday, September 13, 2019

Homberg Drive/Kingston Pike Water Main Project

HOMBERG DRIVE WATER MAIN REPLACEMENT – September 13, 2019 – All water main installation, service line connection, and paving/restoration has been completed on Homberg Drive, S. Mohican Street, and Whitaker Drive.

KINGSTON PIKE WATER MAIN REPLACEMENT – September 13, 2019 – Pre-construction work, including saw-cutting asphalt in preparation for digging, was completed overnight this past Wednesday and Thursday. KUB Underground Construction crews are scheduled to begin excavation work at the intersection of Homberg Drive and Kingston Pike at 8 p.m., Sunday, September 15. As a reminder, this work will be performed overnight from 8 p.m.—6 a.m. through mid-October. The center turn lane will be closed continuously for the duration of the project on the section of Kingston Pike between Westwood Road and Homberg Drive. Additional lane closures will be needed as work shifts to different areas on this section of Kingston Pike. One eastbound and one westbound lane of traffic will be maintained at all times, with closed lanes reopening at 6 a.m. each morning. No work will occur overnight Friday and Saturday night. Flaggers and signs will be onsite to assist with traffic control.


(Bearden Area) Kingston Pike Lane Closures [Overnight, September 16 – Mid October] – KUB crews will implement lane closures of both the eastbound and westbound lanes of Kingston Pike between Westwood Drive and Homberg Drive overnight, from 8 p.m. – 6 a.m., beginning Monday, September 16, through mid-October, as work is performed on the water distribution system in the area. One eastbound and one westbound lane of traffic will be maintained at all times, with closed lanes reopening at 6 a.m. each morning. No work will occur overnight Friday and Saturday night. Flaggers and signs will be onsite to assist with traffic control.

No comments:

Post a Comment