March 9, 2018 UPDATE – Hurst Excavating subcontractor crews continued to rehabilitate wastewater pipes, customer lines, and manholes in the 700 block of Scenic Drive and in the off-road easements along back and side property lines between Scenic Drive and Valencia Road (parallel to Alta Vista Way). Work Zone Shift Update: Next week, crews will take advantage of Knox County Schools being on spring break as they shift the work zone to the area of Southgate Drive in front of Sequoyah Elementary School and the Sequoyah Branch Library (between Sagwa Drive and Sequoyah Avenue). Crews will also work along Keowee Avenue, between Southgate Road and Agawela Avenue. Both above-mentioned sections of Southgate Drive and Keowee Avenue will be closed to through traffic weekdays from 7 a.m. – 5 p.m. Access will be maintained to the school (via Sagwa Drive), library, and driveways in these areas, and both roads will reopen to traffic outside of work hours. Crews will also continue manhole installation and restoration work in the off-road easements between Scenic Drive and Valencia Road. 

No comments:

Post a Comment