Sequoyah Hills Wastewater Project

September 28, 2018 UPDATE – Hurst Excavating crews continued work in the off-road easement between Hiawatha Drive and Alta Vista Way this week. Restoration work will begin in that area next week. Construction crews finished work on the section of Blows Ferry Road between Alta Vista Way and Scenic Drive. Daily road closures will continue in this area between 7 a.m. – 5 p.m., through middle of next week for paving and restoration. Paving and restoration work will also continue next week, with intermittent temporary lane/road closures as needed in the immediate area where crews are working, on Hiawatha Drive, Arrowhead Trail, and Alta Vista Way. Construction requiring a continuous road closure through early October will also resume on Chickasaw Road through next week. Crews will also begin work in off-road easements between Shawnee Lane and Hiawatha Drive next week.

(Sequoyah Hills) Sequoyah Hills Area Road Closures [October 1-5] – KUB contract crews will implement the below road closures as needed daily, Monday-Friday, from 7 a.m. – 5 p.m., October 1-5, as work continues on the wastewater collection system in the area:
· Alta Vista Way between Blows Ferry and Noelton Drive
· Blows Ferry Road between Scenic Drive and Alta Vista Way
· Hiawatha Drive between Noelton Drive and Towanda Trail
· Arrowhead Trail between Dogwood Lane and Alta Vista Way
Additionally, Chickasaw Road between Cherokee Boulevard and Navaho Road will be closed continuously through Friday, October 5, due to extensive excavation. Access to area homes will be maintained, and flaggers and signs will be on site to assist with traffic control. Unless otherwise indicated, roadways will be re-opened outside of work hours. Follow-up advisories will be issued as necessary. 