(Old City Area) E. Depot Avenue Road Closure
[November 30 – December 7] – KUB crews will close a short section of E. Depot Avenue between
Morgan Street and N. Central Street continuously from 3 p.m., Friday, November
30, through 3 p.m., Friday, December 7, as work is performed on the water
distribution system in the area. Alternate routes include E. Magnolia Avenue,
E. Jackson Avenue, and Willow Avenue. Signs will be on site to assist with
traffic control. Follow-up advisories will be issued as necessary.
Friday, November 30, 2018
Thursday, November 29, 2018
Depot Avenue Area Water Main Project
November 29, 2018 UPDATE – Garney Construction has
completed all pipe installation for the new 36-inch water main. The process of
filling and testing the line started this week. As part of this work, Patton Street
will remain closed between Willow Avenue and E. Summit Hill Drive through
mid-December. Paving restoration work has been completed, and roads have been
reopened to normal traffic flow on the section of Patton Street between
Campbell Avenue and Willow Avenue, and on Willow Avenue east of the Patton
Street intersection. Sidewalk and curb repairs remain in these areas, but that
work will not affect traffic flow. Once testing and flushing of the new water
main is completed, Garney Construction will make the final tie-in to connect
the new 36-inch main to the existing water main at the E. Summit Hill Drive and
Patton Street intersection. This tie-in work will require a lane closure on E.
Summit Hill Drive in December. Information on traffic impacts will be
communicated as details are finalized. Please see the below video for a detailed project overview with Project Manager Tommy Lawhorn from KUB Water Systems Engineering.
Jackson Avenue Ramps Utility Relocation Project
November 29, 2018 UPDATE – Weekly Update: Southern Constructors, Inc., continued rehabilitation of the
wastewater system on W. Jackson Avenue this week. The full road closure of W.
Jackson Avenue (between S. Broadway and Gay Street) will remain in effect
through 2 p.m., Friday, November 30. W. Jackson Avenue will be reopened to
normal traffic flow at that time and throughout the weekend. The contractor
will re-close this section of W. Jackson Avenue to through traffic starting at 6
a.m. Monday, December 3, through 6 p.m., Thursday, December 6, to complete
final testing of the wastewater system and pavement restoration. Access to
businesses and parking lots in the work zone will be maintained. See the
attached map for alternate routes around this section of W. Jackson Avenue.
South Knox Natural Gas Project
November 29, 2018 UPDATE – Pipeline:
As of November 9, all right-of-way restoration was finished in the areas where
the new natural gas pipeline was installed. Gate
Station: All mechanical
installations will be complete on the new South Knox Natural Gas Gate Station
by the end of the week. Work continues around the site as the areas around
underground piping and buried conduit are back-filled. Final grading work and
installation of remaining electrical and instrumentation components will
continue over the next several weeks. Additionally, crews will be onsite
installing fencing around the station perimeter and painting inside the
structure.
Construction continues on the new KUB South Knox Natural
Gas Gate Station, located on Tipton Station Road. The new facility is expected
to be ready for operation by January 2019.
Sequoyah Hills Wastewater Project
November 29, 2018 UPDATE – Weekly Update: Construction activity
resumed this week after the Thanksgiving holiday. Construction crews continue
work on the southern end of Noelton Drive, Dogwood Lane, and short sections of
Hiawatha Drive (east of the Noelton Drive intersection) and Mellen Avenue.
Restoration work is also ongoing on Chippewa Circle. These roadways remain
closed daily between 7 a.m. – 5 p.m. Paving and restoration work has been
completed and the roadways reopened to normal traffic flow on the northern
section of Noelton Drive and Chickasaw Road.
Tuesday, November 27, 2018
Jackson Avenue Ramps Utility Relocation Project
TRAFFIC ADVISORY
(Old City) W. Jackson Avenue
Road Closure [November 28-30] – KUB
contract crews will close a section of W. Jackson Avenue between S. Broadway
and S. Gay Street to traffic from 6 a.m., Wednesday, November 28, through 6
p.m., Friday, November 30, as work is performed on the wastewater collection
system in the area. Local traffic access will be maintained via S. Broadway.
Alternate routes include W. Summit Hill Drive, S. Gay Street, Western Avenue,
and S. Broadway. Flaggers and signs will be on site to assist with traffic
control. Access to local businesses will be maintained. Follow-up advisories
will be issued as necessary.
Wednesday, November 21, 2018
Sequoyah Hills Wastewater Project
There will be no blog/map updates posted this week due to
the shortened work week/ Thanksgiving holiday. The next project update will be
posted the week of November 26. Call 865-524-2911 if you have any questions related
to ongoing work in your area.