27, 2018 UPDATE – Hurst
Excavating continued open-cut trench work along Wilani Road this past week. Due
to the depth of excavation in this area, Wilani Road will remain closed
continuously to through traffic between Taliluna Avenue and Southgate Road
through August 3. Access will be maintained to driveways on Wilani Road.
Pipe-bursting crews will continue work along Arrowhead Trail, up to Lyons View
Pike, through August 1, with restoration beginning the following day.
Additional crews will be on Alta Vista, between Blows Ferry and Arrowhead
Trail. Hiawatha drive will
also be closed Wednesday, August 1 through Friday, August 10, between Noelton
Drive and Towanda Trail. NOTES: KUB and Hurst Excavating have noticed that grass recently
planted as part of yard restoration has started to turn brown due to hot, dry
weather. Those areas will be readdressed by the contractor as temperatures
decrease during the fall growing season.
Depot Avenue Water Main Project
July 27, 2018 UPDATE – Garney
Construction crews continued work on Williams Street between W. Magnolia Avenue
and W. Depot Avenue, and also on W. Depot Avenue. The newly installed line on
W. Depot will be tested next week. While this is occurring, the crew will move
to E. Summit Hill Drive at Patton Street. Both westbound lanes of E. Summit
Hill Drive will be closed at Patton Street from 7 a.m., Monday, July 30,
through 5 p.m., Friday, August 3. Westbound traffic will be
detoured to Hill Avenue, Howard Baker Jr. Boulevard, and Hall of Fame Drive,
and other alternate routes include Marking Luther King, Jr., Avenue, McCalla
Avenue, E. Jackson Avenue, and N. Central Street. Additionally, KUB crews will
close Ogden Street between W. Fifth Avenue and The Mews Way from 6 a.m. – 4
p.m. on Saturday, July 28. As a reminder, W. Depot Avenue between Williams
Street and N. Central Street and between N. Central and Morgan Street remains
closed through August 10. A closure of this intersection for work will be
announced at a later date.
(Downtown Knoxville) Ogden Street Road Closure [July 28] – KUB crews will close Ogden Street between W. Magnolia Avenue and Mews Way from 6 a.m. - 4 p.m., Saturday, July 28, as work is performed on the water distribution system in the area. Alternate routes include W. Magnolia Avenue, W. Depot Street, N. Central Street, and Williams Street. Access to local businesses will be maintained, and flaggers and signs will be on site to assist with traffic control.
(Downtown Knoxville) East Summit Hill Drive
Lane Closure [July 30 – August 3] – KUB contract crews will close both westbound lanes of E. Summit
Hill drive at Patton Street from 7 a.m., Monday, July 30, through 5 p.m.,
Friday, August 3, as work is performed on the water distribution system in the
area. Westbound traffic will be detoured to Hill Avenue, Howard Baker Jr.
Boulevard, and Hall of Fame Drive, and other alternate routes include Marking
Luther King, Jr., Avenue, McCalla Avenue, E. Jackson Avenue, and N. Central
Street. Access to local businesses will be maintained, and flaggers and signs
will be on site to assist with traffic control. Electronic message boards also
will be posted near the Summit Hill Drive/State Street intersection and on
Dandridge Avenue to alert motorists of the traffic pattern change.
(Downtown Knoxville) Williams Street Road
Closure [Extended, July 30 – August 3] – KUB contract crews will maintain a closure of
Williams Street between W. Magnolia Avenue and W. Depot Avenue from 7 a.m.,
Monday, July 30, through 6 p.m., Friday, August 3, as work is performed on the
water distribution system in the area. Alternate routes include N. Gay Street,
W. Fifth Avenue, N. Central Street, and Ogden Street. Access to local
businesses will be maintained, and flaggers and barricades will be on site to assist
with traffic control.
South Knox Natural Gas Project
July 27, 2018 UPDATE – Pipeline Installation/Testing:
Cleary Construction crews continued restoration work along the pipeline
installation route in off-road easements. No road closures are scheduled for
next week; however, the righthand turn lane on Chapman Highway (between the
IHOP/CVS entrance and Mountain Grove Road) will remain closed through August 3,
as listed on the map. Work will continue in the Chapman Highway area as the
contractor prepares to make the final tie-in for the new pipeline. Gate Station: Blount Excavating crews continued
site clearing and grading work in preparation for construction of the new
natural gas gate station located at 304 Tipton Station Road. Periodic temporary
lane closures may be needed in this area of Tipton Station Road as construction
equipment and materials are unloaded.
West Hills Natural Gas Project
July 27, 2018 UPDATE – ZONE 2: KUB contractor Classic
City Mechanical worked in the 8100-block of Corteland Drive this week. They
will work in the 8200 block of Chesterfield Drive and the 8300-block of
Bennington Drive next week. ZONE 3: Crews from KUB Underground
Construction completed all work in Zone 3 as of Friday, July 20. Crews from
this area will shift to Zone 4 next week. ZONE 4: East Tennessee Pipeline crews
worked in the 200-block of Buckingham Drive this week and the 7400-block of
Bennington Drive, as well as Shadycrest Drive. Next week, they will continue
work in the 7400-block of Bennington Drive as well as on Bennington Circle and
Shadycrest Drive. KUB has
added 3,000 feet of steel main replacement on Dorchester Drive and Newcastle
Road to the scope of work in Zone 4. Construction is scheduled to begin the
week of August 6. Customers in this area will be notified by mail next week,
prior the start of construction activity.
Friday, July 20, 2018
Sequoyah Hills Wastewater Project
SEQUOYAH HILLS July 20, 2018 UPDATE – Hurst Excavating continued
open-cut trench work along Wilani Road this past week. Due to the depth of
excavation in this area, Wilani Road will remain closed continuously to through
traffic between Taliluna Avenue and Southgate Road through July 27. Access will
be maintained to driveways on Wilani Road. Subcontractor paving and restoration
crews will continue work in the Calumet Drive area next week. Pipe-bursting
crews will continue work along Arrowhead Trail, up to Lyons View Pike. This
past week, pipe-lining crews closed the eastbound lane of Kingston Pike between
Noelton Drive and Towanda Trail from July 18-20. All lanes of Kingston Pike
will reopen to normal traffic flow beginning this weekend. Lining crews also
closed one lane on Scenic Drive on Monday, July 16. Next Monday, July 23, crews
are scheduled to work in an off-road easement near Kingston Park Drive. NOTES:
KUB and Hurst Excavating have noticed that grass recently planted as part of
yard restoration has started to turn brown due to hot, dry weather. Those areas
will be readdressed by the contractor as temperatures decrease during the fall
growing season. As indicated on this week’s map, the City of Knoxville is
currently working on the stormwater system on Noelton Drive and Hiawatha Drive.
This is not part of KUB’s work in the area. Please contact the City of
Knoxville at 311 for more information about their work in this area.
Depot Avenue Water Main Project
July 20, 2018 UPDATE – Garney Construction crews
completed the tie-in to connect the 16-inch water main with the 36-inch water
main at the intersection of W. Fifth Avenue and Williams Street. Installation
of the 36-inch water main has been completed on Williams Street between W.
Fifth Avenue through the W. Magnolia Avenue intersection. This section of road
has been reopened to normal traffic flow, but it will be closed again in the
coming weeks for paving and restoration. Pipe installation crews will continue
work on Williams Street between W. Magnolia Avenue and W. Depot Avenue. The
section of W. Depot Avenue between Williams Street and N. Central Street will
remain closed to through traffic through early August as a second Garney
Construction crew installs an 8-inch water line in this area. Installation of
the 8-inch line is scheduled to begin on E. Depot Avenue on July 25. The N.
Central Street intersection will remain open. Temporary adjustments to the
traffic control plans may be made as the contractor works with area businesses
to accommodate special events.
Additionally, KUB crews will close Ogden Street
between W. Fifth Avenue and The Mews Way from 6 a.m. – 4 p.m. on Saturday, July
21.
(Downtown Knoxville) Williams Street Road Closure [July 16-27] – KUB
contract crews will close Williams Street between W. Magnolia Avenue and W.
Depot Avenue from 7 a.m., Monday, July 16, through 6 p.m., Friday, July 27, as
work is performed on the water distribution system in the area. Alternate
routes include N. Gay Street, W. Fifth Avenue, N. Central Street, and Ogden
Street. Access to local businesses will be maintained, and flaggers and
barricades will be on site to assist with traffic control.
(Downtown Knoxville) W. Depot Avenue Road Closure [July 16 –
August 10] – KUB contract crews will close W. Depot Avenue between Williams
Street and N. Central Street from 7 a.m., Monday, July 16, through 6 p.m., Friday,
August 10, as work is performed on the water distribution system in the area.
Alternate routes include N. Gay Street, W. Fifth Avenue, N. Central Street, and
W. Magnolia Avenue. Access to local businesses will be maintained, and flaggers
and barricades will be on site to assist with traffic control.
West Hills Natural Gas Project
WEST
HILLS GAS July 20, 2018 UPDATE
– ZONE 2: KUB contractor Classic City Mechanical worked in
the 8300-block of Bennington Drive this week. They will work in the 8100 and
8200 blocks of Corteland Drive next week. ZONE 3: Crews from KUB
Underground Construction completed all work in Zone 3
as of Friday, July 20. Crews from this area will shift to Zone 4 next week. ZONE 4: East Tennessee Pipeline crews worked in the
200-block of Buckingham Drive this week, and they will work in that area again
next week. KUB crews will work in the Bennington Drive/Vanosdale Road,
Bennington Drive/Bennington Circle, and Vanosdale Road/Shadycrest Lane
intersections next week. Buckingham Drive: Crews started installation
of 450 feet of natural gas main on Buckingham Drive, between Vanosdale Road and
Portsmouth Road, this past week.
Construction is expected to last through early August in this area. Motorists are advised to expect