Sequoyah Hills Wastewater Project

August 31, 2018 UPDATE –  Hurst Excavating completed pipe installation work on a short section of Towanda Trail this past week. Clean-up and paving restoration crews will return to that area in the coming weeks. Restoration crews also finished and fully re-opened Arrowhead Trail this past week. Construction and restoration requiring weekday lane or road closures as needed between the hours of 7 a.m. – 5 p.m. will be implemented on Hiawatha Drive (between Noelton Drive and Towanda Trail), Arrowhead Trail (between Lyons View Pike and Blows Ferry Road), and Wilani Road (between Southgate Road and Taliluna Avenue) through next week. Alta Vista Way will remain closed continuously between Noelton Drive and Blows Ferry Road through next week due to extensive excavation in this area. The contractor will also start work with daily road closures on the section of Blows Ferry Road between Alta Vista Way and Scenic Drive next week. Crews will not work on Monday, September 3, in observance of Labor Day.

(Sequoyah Hills) Sequoyah Hills Area Road Closures [September 5-7] – KUB contract crews will implement the below road closures as needed daily, Monday-Friday, from 7 a.m. – 5 p.m., September 5-7, as work continues on the wastewater collection system in the area:
·         Hiawatha Drive between Noelton Drive and Towanda Trail
·         Wilani Road between Southgate Road and Taliluna Avenue
·         Blows Ferry Road between Alta Vista Way and Scenic Drive
Additionally, Alta Vista Way between Blows Ferry Road and Noelton Drive will be closed continuously through Friday, September 7, due to extensive excavation. Access to area homes will be maintained, and flaggers and signs will be on site to assist with traffic control. Unless otherwise indicated, roadways will be re-opened outside of work hours. Follow-up advisories will be issued as necessary. 