August 31, 2018 UPDATE – Hurst Excavating completed
pipe installation work on a short section of Towanda Trail this past week.
Clean-up and paving restoration crews will return to that area in the coming
weeks. Restoration crews also finished and fully re-opened Arrowhead Trail this
past week. Construction and restoration requiring weekday lane or road closures
as needed between the hours of 7 a.m. – 5 p.m. will be implemented on Hiawatha
Drive (between Noelton Drive and Towanda Trail), Arrowhead Trail (between Lyons
View Pike and Blows Ferry Road), and Wilani Road (between Southgate Road and
Taliluna Avenue) through next week. Alta Vista Way will remain closed
continuously between Noelton Drive and Blows Ferry Road through next week due
to extensive excavation in this area. The contractor will also start work with
daily road closures on the section of Blows Ferry Road between Alta Vista Way
and Scenic Drive next week. Crews will not work on Monday, September 3, in
observance of Labor Day.
(Sequoyah
Hills) Sequoyah Hills Area Road Closures [September 5-7] – KUB contract crews will implement the below road closures as
needed daily, Monday-Friday, from 7 a.m. – 5
p.m., September 5-7, as work continues on the
wastewater collection system in the area:
·
Hiawatha Drive between Noelton Drive and Towanda Trail
·
Wilani Road between Southgate Road and Taliluna Avenue
·
Blows Ferry Road between Alta Vista Way and Scenic Drive
Additionally, Alta Vista Way
between Blows Ferry Road and Noelton Drive will be closed continuously through
Friday, September 7, due to extensive excavation. Access to area homes will be
maintained, and flaggers and signs will be on site to assist with traffic
control. Unless otherwise indicated, roadways will be re-opened outside of work hours. Follow-up
advisories will be issued as necessary.