December 7, 2018 UPDATE The block of Patton Street between Willow Avenue and E. Summit Hill Drive will reopen to normal traffic flow by midday Friday, December 7, in preparation for the evening WIVK Christmas Parade in the downtown area. Garney Construction finished pressure testing the new 36-inch in water main this past week. Additional pipeline testing and cleaning will take place next week before final tie-ins are made. The above-mentioned section of Patton Street will close again Monday morning, December 10, and will remain closed through Friday, December 21, for testing and cleaning. Additionally, Blackstock Avenue will be reduced to one alternating lane of traffic near the Heins Street intersection in association with final pipeline prep work the week of December 10. The final tie-in to connect the 36-inch main is scheduled to take place the week of December 17. This work will require a lane closure on E. Summit Hill Drive, and information will be communicated as details for this last stage of the project are finalized.



(Downtown Area) Blackstock Avenue Lane Closure [December 10–14] – KUB contract crews will close a short section of the westbound lane of Blackstock Avenue between Heins Street and Hannah Avenue from 7 a.m., Monday, December 10, through 6 p.m., Friday, December 14, as work is performed on the water distribution system in the area. The eastbound lane will remain open and will be used to alternate traffic through the work zone. Access to area business will be maintained. Appropriate signage and flaggers will be on site to assist with traffic control. Follow-up advisories will be issued as necessary.



No comments:

Post a Comment