- Bluff
View Road between Southgate Road and Holloway Drive
- Kenesaw Avenue between Taliluna Avenue and Keowee Avenue
Yard/Easement
Restoration – Weather
has had a major impact on yard/easement restoration efforts as recent hot and
dry weather have combined to prevent planted grass seed from taking root and
growing. With a return to a more normal weather pattern, Morgan
Construction and its subcontractors have resumed general clean-up and
re-planting grass and placing straw. Restoration may take several weeks,
but work will continue until all construction areas are repaired.
Closed-circuit
Television Inspection – Crews will continue to work throughout the Phase 2 area next
week. Temporary lane closures will be implemented as needed when crews are
present.
Manhole
Rehabilitation – Crews will work throughout the Phase 2 area next week.
Temporary lane closures will be implemented as needed when crews are present.
Sequoyah
Park –
Morgan Construction and their subcontractors continue to rehabilitate the
existing wastewater main and manholes in Sequoyah Park. See the attached map
showing current work corridors within the park. The park, all entrances and
parking areas, and boat ramp remain open during this work. Morgan Construction
is also maintaining a fenced area in the middle parking lot for equipment and
materials storage. KUB has coordinated work in the park with City of Knoxville
Parks and Recreation and the Kingston Pike Sequoyah Hills Association.
Informational banners have been placed in the park entrances/parking areas to
provide park visitors with details about the wastewater rehabilitation work.
Updates on the progress of work in the park will be posted weekly and as needed
on this blog site.
Natural
Gas System Work – Crews have resumed natural gas inspection and maintenance
work at various locations throughout Sequoyah Hills. This work may require
short term traffic impacts in the immediate area where crews are working.
No comments:
Post a Comment