Video featuring an interview with KUB project manager Sam Beck.
(Sequoyah Hills) Sequoyah Hills Area Road Closures [November 12-16] – KUB contract crews will implement the below road closures as needed daily, Monday-Friday, from 7 a.m. – 5 p.m., November 12 - 16, as work continues on the wastewater collection system in the area:
- Hiawatha Drive between Noelton Drive and Towanda Trail
- Noelton Drive between Kingston Pike and Chippewa Circle
- Noelton Drive between Alta Vista Way and Chippewa
Circle
- Chippewa Circle between Noelton Drive
- Dogwood Lane between Arrowhead Trail and Noelton Drive
Chickasaw Road between
Cherokee Boulevard and Navaho Road will be closed continuously Monday, November
12, through Friday, November 16, due to extensive excavation. Access to area
homes will be maintained, and flaggers and signs will be on site to assist with
traffic control. Unless otherwise indicated, roadways will be re-opened outside of
work hours. Follow-up advisories will be issued as necessary.
No comments:
Post a Comment